← Back to headlines
Pune-Mumbai Expressway Link Blocked by Landslide
A significant landslide on the Pune-Mumbai Missing Link section of the expressway caused an eighteen-hour traffic shutdown. Approximately one hundred tonnes of mud and rock fell onto the road near tunnel two, following heavy rainfall.
6 Jul, 20:18 — 6 Jul, 20:18

