← Back to headlines
Advanced Shield Machine Deployed for Deepest Railway Tunnel Along the Yangtze River
Engineers have introduced a super-large-diameter slurry balance shield machine to facilitate construction of a major underground rail project beneath the Yangtze.
30 Aug, 15:08 — 30 Aug, 15:08


