← Back to headlines

Akosombo Hydroelectric Dam Fully Operational After Fire
Ghana's Akosombo Hydroelectric Dam has fully restored electricity generation, with all six turbines operational, following disruptions caused by a fire at the Volta River Authority switchyard control room.
1 May, 12:22 — 1 May, 12:22



