← Back to headlines




Fukushima nuclear power plant discharging final round of treated water for FY2025
The operation, scheduled to run until March 24, will result in the release of about 7,800 tons of treated water containing tritium.
6 Mar, 09:52 — 6 Mar, 09:52
Related Stories

UAE Pledges $10 Million in Aid Following Devastating Floods in Nepal
19m ago

Russian Drone Strikes Target Ukrainian Infrastructure as Zelensky Visits Moldova
27m ago

Deadly Flash Floods in Nepal and Tibet Kill Hundreds After Glacier Break
30m ago

Former Teacher Convicted of Historic Indecent Assaults Against London Pupils
38m ago