← Back to headlines





Ghana's Energy Ministry Addresses Vulnerability of Power System
Ghana's Energy Ministry acknowledged the vulnerability of the nation's power system due to the lack of a permanent control room. The ministry stated that a temporary control room is expected to be ready by September, urging the public to bear with the current system.
20 Aug, 20:19 — 20 Aug, 20:19
Related Stories

Trump Signs Order to Rename Lake Ontario as Lake America
19m ago

Jury Deliberates in Trial of Lindsay Clancy Accused of Murdering Her Three Children
39m ago

US Warns Patriot Missile Stocks in Europe Drop to Critical Levels
41m ago

Trump Says Putin Will Not Attack NATO Territory After Speaking with Him
49m ago