← Back to headlines

Paks Nuclear Power Plant Bottom Sill Redesign May Be Necessary
The bottom sill of the Paks nuclear power plant may require redesign in the long term, particularly the 150-meter section within the shipping lane, which was designed to be removable.
Sources
Showing 0 of 1 sources
No articles available in your preferred languages.
1 article available in other languages below.


