← Back to headlines
PJM Grid Operator Removes Oklo Advanced Nuclear Project from Study Cycle
The PJM Interconnection has dropped Oklo’s advanced nuclear reactor project from its current interconnection study cycle, delaying its integration into the regional power grid.
Sources
Showing 0 of 1 sources
No articles available in your preferred languages.
1 article available in other languages below.



