← Back to headlines

Temporary Steel Bridge to be Installed Across River Oti by July
Preparatory works for the Dambai Bridge construction are advancing, with a temporary steel bridge expected to be installed across the River Oti by the end of July 2026. This installation is a crucial phase in the long-awaited project.
3 Jul, 15:03 — 3 Jul, 15:03


